2019 Capstone Projects
Each member of the Freight Academy 2019 was assigned to a capstone project group, and each group was tasked to come up with a plan to address a specific set of needs based on a fictional scenario, and present that plan in both a report and presentation format. The assignments required integration of the material gathered throughout the week in both classroom sessions and field visits. The groups met periodically during the week to begin addressing the assignment, and then continued to work together to finalize their projects after the program ended. Via webcast, each group presented their final plan to a mock Executive Board comprised of subject-expert executive-level mentors from the I-95 Corridor Coalition. The mentor panels provided invaluable insight and feedback furthering the participants’ educational experience.
A copy of each of the groups’ assignments, reports, and final presentations are posted below. These project reports are purely hypothetical, and should not be used out of that context.
Group 1: Inland Port Capstone
Group 2: Rail Track Improvements and Historic Rail Bridge Reconstruction Projects
Group 3: Addressing Port Congestion and Economic Development
Group 4: Improving Network Resiliency Through Inter-State Corridor Coordination
Group 5: Resiliency Capstone